Wednesday, 18 November 2009

Repairs

The heating and hot water packed up last night so had to cancel meeting Jane in Poole so could wait in for engineer to arrive. I got dogs out for first walk after reporting heating and bathroom sink being blocked to the council. Shortly after I got back heating engineer arrived and sorted it out in about 10 minutes. I tried to get dogs out for their second walk about 12 and Dainty was limping on her back right leg. I tried her 3 more times every half hour before we managed to get down to the backwaters about 2.30. Hopefully she’s just having a bad day today and she’ll be better tomorrow. Ang is not good at the minute because she was up 3 times in the night. Hopefully she’ll be better tomorrow. The drain bloke arrived in the afternoon and sorted it out in about 20 minutes. I wasn’t expecting him to arrive for a few days.

No comments: